The Water Research Commission (WRC) is embarking on an ambitious programme to ensure the effective siltation management and improved storage capacity of 320 State-owned, Department of Water and Sanitation– (DWS-) managed large dams.
The three-year National Dam Siltation Management Strategy in South Africa, or NatSilt, project, was launched during a two-day virtual WRC NatSilt Symposium from May 19 to 20, after the WRC was appointed by the DWS to manage and implement the project.
Funded by the DWS, the programme’s overarching aim is to develop and pilot a strategy that will guide, advise and ensure effective siltation management and related improved storage capacity for dams.
The programme sets out to address reservoir storage losses experienced owing to dam siltation, the accumulation of sediments and silt in dams as a result of soil erosion.
In the last year, some of the country’s dams have experienced up to 90% sedimentation with storage capacity losses ranging between 10% and 30%.
The WRC will be developing a package of siltation management solutions, including the relevant tools, models, frameworks, protocols, guides and plans to assist with the implementation and monitoring of the strategy.
This will assist the DWS in sustaining supply to domestic, industrial, strategic and agricultural bulk water users, as well as save scarce financial resources by extending the lifecycle of existing dams.
The programme will result in the development of a dam basin siltation management operations model, a sustainable dredging business model, a dam basin classification decision-making tool, capacity building, a step-by-step comprehensive implementation plan and the piloting of the draft strategy, models and tools.
Phase 1 comprises research, assessments and the development of a siltation management strategy and related tools for large dams, while the piloting of various models, concepts and the tools will be undertaken in Phase 2.
A review and revision towards a final strategy, with relevant models and tools, will be completed in the final third phase.
The pilot plan will potentially be rolled out in three government water schemes, namely Welbedacht dam in the Free State; Hazelmere dam in KwaZulu-Natal and Darlington Dam/Orange-Fish GWS in the Eastern Cape.
The programme has four sub-projects that will be integrated and managed as one programme to meet the desired objectives.
The strategy development sub-project comprises a situational analysis, the engagement of a broad range of stakeholders, mapping of the drivers and challenges linked to potential solutions and the provision of an up-to-date state of dam siltation management in South Africa.
The development of the relevant tools, models, frameworks, protocols, guides and plans will assist with the implementation and monitoring of the strategy.
Under a sub-project called ‘dam engineering and socioecological systems’, the team will generate and test tools that will enable the alleviation of dam siltation through optimised catchment management as well as dam engineering methodologies and innovations.
The ‘sustainable dredging of dams’ sub-project recognises the importance of dredging and will work to develop sustainable, cost-effective dam dredging model and protocols for a variety of “learning” dams and contexts.
Priority sites will be identified through a consultative process to capture areas requiring intervention and that are representative of a larger set of dams.
The programme will also have a training and capacity development component to develop a new cohort of skilled professionals and citizens to enhance and improve the efficiency of dam siltation management